PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Aligning the stone panels at the 3rd floor Facing North.jpg Continued laying out block at Bathrooms 133-136 Facing South.jpg Copper piping at the 3rd floor Facing South-West.jpg Installed cmu block at the 1st floor detention cells Facing North-West.jpg Installing copper piping at the 2nd floor bathroom sinks Facing West.jpg Paching Inside Elevator 1,2,3 shear walls Facing West.jpg pour concrete at Elevator 1,2,3 pocket 2nd floor Facing East.jpg Sprinkler piping at Stair -4 Facing North 2.jpg
Previous pageNext page Installed cmu block at the 1st floor detention cells Facing North-West
Installed cmu block at the 1st floor detention cells Facing North-West